我正在使用 JUnit4.
I am using JUnit4.
我在一个测试用例中有一套测试方法.
I have a set of test methods in a test case.
每个测试方法插入一些记录并验证一个测试结果,最后删除插入的记录.
Each test method inserts some records and verify a test result and finally delete the records inserted.
由于 JUnit 并行运行,测试方法会因为某些原因而失败以前的测试方法执行期间存在的记录.这只发生在我同事的机器上(Windows 7),不在我的机器上(Cent操作系统 6).
Since the JUnit run in parallel, test methods fail because of some records present during the execution of previous test method. This happen only in my colleague machine(Windows 7), not in my machine(Cent OS 6).
我们需要的是测试方法必须在我们所有的机器中通过.
What we need is that the test methods have to pass in all our machines.
我已尝试清除 Setup() 方法中的记录,但它再次仅适用于我的机器.JUnit 中是否有任何选项可以使测试方法以统一的顺序运行?
I have tried clearing the records in the Setup() method but again it works only on my machine. Is there any option available in JUnit to make the test methods to run in a uniform sequential order ?
谢谢,
JUnit 4.11 现在支持使用 @FixMethodOrder 注解.
JUnit 4.11 now supports specifying execution order using @FixMethodOrder annotation.
这篇关于如何使 JUnit 测试用例按顺序运行?的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持html5模板网!
解析 ISO 8601 字符串本地日期时间,就像在 UTC 中Parsing an ISO 8601 string local date-time as if in UTC(解析 ISO 8601 字符串本地日期时间,就像在 UTC 中一样)
如何将公历字符串转换为公历?How to convert Gregorian string to Gregorian Calendar?(如何将公历字符串转换为公历?)
Java:GregorianCalendar 的最大值和最小值是什么/在哪Java: What/where are the maximum and minimum values of a GregorianCalendar?(Java:GregorianCalendar 的最大值和最小值是什么/在哪里?)
1582 年 10 月 15 日之前日期的日历到日期转换.公历Calendar to Date conversion for dates before 15 Oct 1582. Gregorian to Julian calendar switch(1582 年 10 月 15 日之前日期的日历到日期转换
java日历setFirstDayOfWeek不起作用java Calendar setFirstDayOfWeek not working(java日历setFirstDayOfWeek不起作用)
Java:获取当前星期几的值Java: getting current Day of the Week value(Java:获取当前星期几的值)